1.In Gongbei Customs Guishan Wharf Repair Design,based on the in-depth analysis of the cur-rent situation of the wharf,proper measures are taken,so that the wharf foundation bearing capacity satisfies the operation requirements.
在拱北海关桂山码头修复设计中,认真分析了码头的现状后,采取了有针对性的措施,使码头地基承载力满足使用要求。
2.Abstract: On the basis of the space structure model,the behavio r of natural oscillation of open pile-supported beam-slab wharf and its dynamic response to wave forces were calculated and analyzed.It is pointed out that dyna mic analysis should be made when an open pile-supported wharf is designed.
文摘:本文在空间结构模型的基础上,对开敞式桩基梁板码头结构的自振特性及其在波浪力作用下的动力响应进行了计算分析,指出开敞式桩基码头设计应进行动力分析。
3.To avoid influences on the operation environment of the existed passenger wharf, attentions shall be especially paid on the influence of revetment engineering on the surrounding water area in revetment scheme selection and during engineering implementation, so as to ensure normal operation of the existed passenger wharf.
摘要为避免影响已建客运码头使用环境,在护案方案选择和工程实施过程中,需着重注意护岸工程对周围水域的影响,确保已建客运码头的正常营运。
4.In order to obtain the design data for 300 000 tonnage oil tanker terminal in Rizhao Harbour,the model tests were made to measure the acting force of tanker on wharf structure,the maximum tanker displacement,the maximum mooring rope tension,the impact energy and impect force of tanker on fender under the actions of wind,wave and current,which provides reliable basis for making the wharf design and formulating the ship operation rules.
日照港拟在岚北港区建设30万吨级原油码头,通过实验测定了船舶在风、浪、流作用下对码头结构的作用力、船舶运动量最大值、最大缆绳拉力、船舶对护舷撞击能量和撞击力,为工程结构设计和操船规程的制定提供可靠依据。
5.Combining Rizhao Port Bulk Grain Wharf and Container Wharf, this paper discusses the caisson placing construction technique.
结合日照港散粮码头和集装箱码头实际情况,简要介绍沉箱安装施工技术。
6.When the deviation between the placing position and construction reference line of caisson for gravity wharf is big enough, the verticality of upper structure, i.e. crest wall will be affected, and furthermore the visual quality of the wharf will be influenced.
摘要重力式码头沉箱安装的位置与施工准线的偏差过大,会影响上部结构胸墙的竖直度,进而影响到码头观感质量。
7.Calculation of Berth Number at Supply Wharf and Ice-Adding Wharf in Fishery Harbour
渔港物资码头和加冰码头泊位数计算
8.9 Xiaoshan Jiangdong Wharf The wharf is built as a loading and unloading habour for 5000-ton freighter, which has the capacity of handling 1500 to 2000 tons of freight annually.
8 3萧山江东出海码头码头拟建规模为5000吨装载货轮的靠离装卸场地,年货物吞吐量为1500-2000万吨。目标为杭州及周边地区国际生产资料的航运中心。
9.In recent years, evident deformation of shore slope for piled wharf occurred at many corners of piers in Tianjin Port, resulting in relative displacement and deformation of inshore structures, which grievously affects the safety of wharf structures.
摘要近几年天津港多个突堤转角处的高桩码头岸坡变形比较明显,导致码头后方承台结构构件出现明显的相对错位、变形等破损情况,严重影响了码头结构物安全。
10.There is a serious sediment deposition in the wharf apron of an alongshore pile wharf.
摘要顺岸式桩基码头前沿会发生较??严重的泥沙淤积。