爱词霸英语  爱词霸汉语  手机爱词霸 | English
每日一句:正在加载...
会话帮助
 
您当前位置:情景会话首页 > 会话搜索
有关“pillar”的搜索结果
标题(0) 句子(0) 句库(10)  
以下 句库例句中包含 pillar 
1.Abstract: In order to analyze the pillar stability of strip mining comprehensively,the new method of combined rock mechanics is complied in this paper.The influence of rock layer effect on the coal pillar stability is analyzed,finding the coal pillar strength increased and its stability improved. 
文摘:为了全面地分析条带煤柱的稳定性,本文采用新兴的复合岩体力学理论,分析了岩体层面效应对煤柱稳定性的影响,发现此种效应可引起煤柱强度提高,从而改善其稳定性。

2.On the illustration of mining in deeply inclined coal seam under buildings in Muchengjian Colliery in Beijing, the confirmation method of coal pillar dimension and the united layout of pseudo-dip strip pillar and boundary pillar were put forward to provide theory foundation for the control of surface movement and subsidence in the mining of deeply inclined coal seam. 
摘要以北京木城涧煤矿大台井建筑物下压煤开采为例,提出了急倾斜煤层开采条件下条带煤柱尺寸的确定方法和倾斜条带煤柱与边界煤柱相结合的条带布置方案,为急倾斜煤层开采地表沉陷控制提供了理论依据。

3.Thus he set up the pillars at the porch of the nave; and he set up the right pillar and named it Jachin, and he set up the left pillar and named it Boaz. 
王上7:21他将两根柱子立在殿廊前头、右边立一根、起名叫雅斤.左边立一根、起名叫波阿斯。

4.After the signing of Amsterdam Treaty, the related regulations of migration transferred from the first pillar to the third pillar. 
阿姆斯特丹条约签订以后,移民相关规定由第三支柱转移到第一支柱,虽然欧盟成员国有意借由欧盟层次建立共同移民规范,然而现阶段欧盟移民治理仍主要以成员国治理与政府间合作的方式进行。

5.All of these provide a basically technological support to the determination of safety coal-rock pillar types and the reasonable height of coal-rock pillar to avoid groundwater rush during first level mining. 
经数值模拟计算的结果和沉积相与富水性之间的关系的综合分析,将区内“四含”分为强富水区、中等富水区和弱富水区三种类型,为煤矿一阶段水平开采前对于确定煤岩柱类型和留设合理的煤岩柱高度提供了技术支撑。

6.It described the suscessing test with pillar mettled which have applied manual pillar at gentel dip thick orebody in Heging Manganese Mine. 
介绍了在鹤庆县锰矿缓倾斜厚矿体中,试验成功的人工柱锚杆房柱采矿法。

7.Mining practice of shrinking water-prevetion rock pillar and leaving sand-prevention pillar under the loose layer of Cenozoic Era(Kz) 
新生代松散层下缩小防水岩柱留设防砂煤柱开采实践

8.In order to evaluate the stability of the upper structure of the cross and the pillar-soil compound foundation, and provide more theoretical bases for design and construction of this type of jacking frame-overhead cross in future, the 2D FEM analyses for bearing-deformation of the frame structure of the cross and the pillar-soil compound foundation are carried out, and some relevant conclusions are obtained. 
为了评判该立交桥上部结构与桩-土复合地基的稳定状态,同时为今后此类型顶进框架立交桥的设计与施工提供更多的理论依据,对该立交桥的框架结构与桩-土复合地基的承载变形进行了平面有限元分析,取得了相应的认识。

9.According to the action of cantilever rock seam on the overly- ing strata of coal body, the paper analyses the distribution rule of abutment pressure and the theoretical basis of narrow pillar drift and exploies the sup- port type of drifts in inclined and steep inclined coal seam under the condi- tion of narrow pillar drift. 
从悬伸岩层对煤体上覆岩层作用的角度,分析了支承压力分布规律的形成和小煤柱护巷的理论依据,并对小煤柱护巷条件下急倾斜与倾斜煤层中巷道的支护方式进行了一定程度的探讨。

10.It is indicated that the span and flexural stiffness of cavern roof, the dimension and brittleness of coal pillar, the uniformity of coal material and the size of mineral grain are the important factors influencing rock burst of coal pillar. 
分析表明,顶板的跨径、顶板的抗弯刚度、煤柱的尺寸、谋柱的脆性、煤岩材料的均匀性和矿物颗粒的大小是煤柱岩爆的重要影响因素。

 
 
博客空间 | 交友圈子 | 英语论坛 | VOA听力 | 英语测验 | 背单词 | 英文电影 | 英语小游戏 | 大讲堂 | 奥运英语 | 托福 | 手机短信 | 雅思 | 考研 | 英文歌曲 | 英语口语 | 英语四六级 |
关于爱词霸 | 谷歌金山词霸 | 购买词霸 | 加入收藏 | 网站导航 | 共享词汇 | 共享短句 | 日语在线翻译 | 韩语在线翻译 | 找朋友,学英语,来爱词霸 © 2009 Kingsoft 京ICP备06025896