1.The dam of the Dahuashui hydroelectric project is a RCC double curvature arch dam with gravity buttress on the left bank with a dam height of 134.50m. Due to the structural complexity of the arch dam and gravity buttress,the quality control of the construction work must be attached to great importance.
大花水水电站拦河大坝为碾压混凝土抛物线双曲拱坝+左岸重力墩,拱坝高134.50 m,由于拱坝和重力墩结构复杂,施工质量的控制是施工中的重点。
2.An Approximate Analysis of Temperature Stresses of Buttress Dam
支墩?挝露扔αΦ慕?品治
3.Introduced here in the paper are three thread connection-related techniques / patents,namely,the "Non-thread Sticking Coupling with Round Thread Connection",the"Oil Field Service Casing with High Strength Round Thread Connection"(HS-RTC)and the"High Airtight Buttress Threaded Casing"(HT-BTC).
介绍了“圆螺纹连接不粘扣接箍”、“油田用高连接强度圆螺纹套管(HS-RTC)”、“高气密偏梯形螺纹套管(HT-BTC)”等技术和专利。
4.buttress dam
支墩坝
5.Methods: There are 36 patients, according to Schatzker classification: type IV 8 cases,type V 17 cases,type VI 11 cases, treaded with doubles(medial and lateral)buttress plates and after operation early CPM.
方法:本组共36例,按 Schatzker分型,IV型8例,V型17例,VI型11例,手术采用内外侧双钢板固定,术后早期 CPM。
8.(architecture) a slender upright spire at the top of a buttress of tower.
(建筑学术语)塔顶上一个很细的直立的尖顶。
9.Discussion on Indicatrix of Displacement Observation Accuracy of Both the Anchorage Block and the Buttress in High-Head Diversion Power Plant
高水头水电站镇支墩位移观测精度指标的研讨
10.Analysis of Stability of Cracks in the Diamond Head of a Buttress Dam
单克墩大头坝劈头裂缝稳定性分析